About us

Company expansion

On May 10, 2019, the start of construction of our new factory building in Rosdorf in the industrial area of Siekanger Mitte was celebrated. By mid-2020, a state-of-the-art, fully tempered building with around 6500 m² of production and office space will be built there and will accommodate 120 employees.

Akcurate Hinter dem Hamberge

New building, building complex consisting of one-storey assembly hall with storage areas, machining, master's offices and measuring room and connected three-storey administrative wing with offices, conference areas and social rooms.

Outdoor facilities with employee parking spaces and delivery for production.

In addition to the architectural and functional solutions, the construction of the building in the KFW 40 standard is an essential aspect of the design and energy concept. This is essentially achieved with the following efficiency modules:

  • Cascade heat pump system consisting of 5 heat pumps for heating and cooling including additional free cooling for the cold days of the year.
  • Ventilation system with heat recovery.
  • Compressed air generating plant with heat recovery.
  • Photovoltaic system with 100 kWp.
  • Concrete core activation of the ceilings and soles.
  • Green roofs to improve summer heat protection.

Address / Building site:

Gewerbegebiet Siekanger-Mitte
Siekweg 12
37124 Rosdorf

Total usable area:

6058 m² (offices and assembly hall)
Assembly hall: 4550 m²
Office building: 1508 m²

Investment:

14.2 € million net
(Buildings and machines)

Construction time:

June 2019 - July 2020

Number of employees May 2019:

58

Number of employees planned:

120